| Viewing Single Post From: SULAIMANI | Tramway - under design - On-Hold | |
|---|---|
| ALAN | 21st November 2012 - 09:29 PM |
![]()
|
Total Km: 58 Total lines: 6 Total electricity require: 20MW Total transfer capacity: 3000 Company: (HJI) from Italy ![]() http://snnc.co/detail.aspx?id=2934&LinkID=1 |
| Russian Girenak Joseph, who visited Kirkuk in Kurdistan as a part of his tour throu the 1870 - 1873 AD, who published the results of his trip & his studies later in 1879, in the 4th volume in the Bulletin of the Caucasus department of the Royal Geographical Russian Society estimated Kirkuk's population as many as 12-50,000 people, & he emphasized that except 40 Christian families, the rest of the population were Kurds. As for The Turkmen & Arabs, they have not been already existed at the time. | |
|
|
| SULAIMANI | Tramway - under design - On-Hold · Projects under Construction | |







9:11 PM Mar 21